Why do I get a busy notification on the meter and my reading are wrong at the end of test When testing a GE I-210 meter.

Why do I get a busy notification on the meter and my reading are wrong at the end of test When testing a GE I-210 meter.



When testing a GE I-210 meter I get a busy on the meter and my reading are wrong at the end of test.

Description of the problem :

The GE I-210 equipped with AMI modules will transmit every 60 seconds and will create false pulse during the test.

Solution :

In the configuration menu, go the General edition and shorten the duration of test to 10 seconds, this will allow you to test the meter in between the transition of those pulses. Start the test as soon as the Busy signal flashes on the meter.


    • Related Articles

    • Why do I get a busy notification on the meter and my reading are wrong at the end of test when testing a GE I-210 meter

      When testing a GE I-210 meter I get a busy on the meter and my reading are wrong at the end of test. Description of the problem: The GE I-210 equipped with AMI modules will transmit every 60 seconds and will create false pulse during the test. ...
    • Will there be a power interruption for the customer while testing the meter?

      The customer has power back for the duration of the test thanks to our internal bypasses.The only outage the customer experience is when removing the meter to insert the tester and when removing the tester to put the meter back in the installation. ...
    • What is Demand test?

      Demand test Ho does it work? The Demand test is used to test meters that have a demand register, (no accessories are needed). The meter must first be configured to be in kW demand test mode (check meter manual for device specific procedure). The ...
    • What is Four Quadrant test (4 Quad Test)?

      What is a Four Quadrant test? The Four Quadrant test is an automatic test sequence that can be used to assess the meter’s ability to register energy in all four quadrants of the power vector diagram. The Four Quadrant Test runs an equivalent of the ...
    • How does the Admittance test work?

      Admittance test What is the Admittance test? This test is conducted by injecting a small, 1,525 Hz audio frequency into the CT secondary, then measuring the audio frequency's induced current to determine the admittance value. Analog filtering and ...