The testers do not use customer load, the tester creates it's own loads with the built-in a separate three phase synthesised phantom load.
This is for all self-contained meters or any meter base that does not have meter base bypasses.
For CT rated meters, the installations bypasses shall be used to avoid opening the current transformers secondary coil.