What is Line Monitor test?
Line Monitor
How does it work?
The Line Monitor test is used to observe the line voltage and frequency.
There are no prerequisites for running the Line Monitor test.
- The minimum, maximum and average for both the voltage and frequency is displayed
- Line voltage THD measurement can also be displayed to see the noise on the voltage.
This test does not save data to the device memory.
Related Articles
What is Demand test?
Demand test Ho does it work? The Demand test is used to test meters that have a demand register, (no accessories are needed). The meter must first be configured to be in kW demand test mode (check meter manual for device specific procedure). The ...
What is Four Quadrant test (4 Quad Test)?
What is a Four Quadrant test? The Four Quadrant test is an automatic test sequence that can be used to assess the meter’s ability to register energy in all four quadrants of the power vector diagram. The Four Quadrant Test runs an equivalent of the ...
What is the Full test?
Full Test How does it work? The Full test is used to fully assess the quality of a meter, as it runs a complete sequence of sub-tests. The Full test runs an equivalent of the Quick Test followed by additional single-element tests. To execute a Full ...
WT Series Error Code Index
WT Series Error Code Index Below is an index of the WT Series Error code and some suggestions to solve the issues. If the message continues to appear, please contact Probewell Lab Inc Technical Service. Error Codes Suggestions 108 ...
What is the Custom test?
Custom Test How does it work? The Custom test is used to test a specific combination of load and active phase. Once the test is completed, the user can save the test data in the device memory. To execute a Custom test, an optical pickup or a Metercam ...