How does it work?
The Full test is used to fully assess the quality of a meter, as it runs a complete sequence of sub-tests.
The Full test runs an equivalent of the Quick Test followed by additional single-element tests.
To execute a Full test, an optical pickup or a metercam must be installed on the WT series tester.
The sub-tests are:
- All phases - High Load (HL),
- All phases - Power Factor (PF),
- All Phases - Low Load (LL),
- Phase A - High Load (HL),
- Phase A - Power Factor (PF),
- Phase A - Low Load (LL),
If applicable
- Phase B - High Load (HL),
- Phase B - Power Factor (PF),
- Phase B - Low Load (LL).
- Phase C - High Load (HL),
- Phase C - Power Factor (PF),
- Phase C - Low Load (LL)
Once the test is completed, the user may save the test data in the device memory.